563-920-7340
duanerobinson1945@gmail.com
Services
Projects & Equipment
About
Contact
Services
Projects & Equipment
About
Contact
Projects & Equipment
Home
Equipment
Show All
Deep trenching
Dewatering
Fabrication
Tiling
Trenching
Tile stringing truck and plow installing 12 in flexible dual-wall
Tiling
Tile installation for demonstration plot
Tiling
Pipeline dewatering
Dewatering
Installing an 8 inch tee on a previously installed 2,200 foot tile line
Tiling
Hookup on permanent dewatering site at 14 ft depth where the original ground level initially was only 2 ft
Dewatering
Farm tile installation with porous backfill
Tiling
Farm tile installation with porous backfill. Clean process with plow/rock carrier combination to reduce spillage
Tiling
BSY Hollanddrain 4500 at completion of a line for dewatering
Dewatering
75,000 ft. tile job
Tiling
15 ft machine straddling trench
Trenching
BSY Hollanddrain Plow
Tiling
Rebuilding hydraulic cylinder
Fabrication
Rebuilding hydraulic cylinder
Fabrication
Lagoon tile installation with porous backfill with a deep trencher
Deep trenching
Hydraulic spring
Dewatering
Draining a pit for a grain elevator leg
Deep trenching, Dewatering
Installing rigid sticks of 15″ dual-wall pipe
Tiling
Production farm tiling
Tiling